Home » Downloads » A project manager needs to use advanced metrics

A project manager needs to use advanced metrics

A project manager needs to use advanced metrics

To manage a project in general and costs in particular, a project manager needs to use advanced metrics, such as earned value management (EVM).

Write a 3-page analysis on the new marketing mailing earned value analysis template provided.

Submitting your assignment in APA format means, at a minimum, you will need the following:

Title page: Remember the running head. The title should be in all capitals.
Length: 3 pages minimum
Body: This begins on the page following the title page and abstract page and must be double-spaced (be careful not to triple- or quadruple-space between paragraphs). The typeface should be 12-pt. Times Roman or 12-pt. Courier in regular black type. Do not use color, bold type, or italics, except as required for APA-level headings and references. The deliverable length of the body of your paper for this assignment is 3 pages. In-body academic citations to support your decisions and analysis are required. A variety of academic sources is encouraged.
Reference page: References that align with your in-body academic sources are listed on the final page of your paper. The references must be in APA format using appropriate spacing, hanging indent, italics, and uppercase and lowercase usage as appropriate for the type of resource used. Remember, the Reference page is not a bibliography but a further listing of the abbreviated in-body citations used in the paper. Every referenced item must have a corresponding in-body citation.

Answer preview to A project manager needs to use advanced metrics

A project manager needs to use advanced metrics

APA

1394 words

Get instant access to the full solution from yourhomeworksolutions by clicking the purchase button below