Home » Downloads » Develop a plan of action for cleaning up the wiring structure, laying new fiber cable

Develop a plan of action for cleaning up the wiring structure, laying new fiber cable

Develop a plan of action for cleaning up the wiring structure, laying new fiber cable

Network Cabling

Description

The Sunshine Health Corporation has requested you evaluate their Scottsdale, Arizona facility. The original structure was built in 1965. The facility has undergone several remodels aesthetically, with no real infrastructure changes. The facility is wired with coaxial cable and RJ11 for telephone. In 1995 each office and the production facility were wired with Cat 3 cable. Much of this cabling still exists. In 2001, the executive offices were wired with Cat 5 cable.

Upon inspection, none of the old cabling has been removed. The main communications room where telephone and networking equipment is housed has access to all the old cabling which is unlabeled. The client would like you to assess a modification plan for bringing this facility up to speed. Their previous contractor purchased several networking devices and was never able to get the equipment to operate at capacity. In your preliminary report, it was stated that wiring would need to be brought up to current networking needs in order to make best use of existing equipment. It appears there will be some need for upgrading equipment also as the wrong equipment was purchased.

For this assignment develop a plan of action for cleaning up the wiring structure, laying new fiber cable where necessary, and present the idea of developing wireless LANs, and Wi-Fi capability throughout the facility. Please discuss also potential cost savings upon completion of a plan.

The building is two stories of offices in the front of the building covering approximately 20,000 square feet between both floors. The remainder of the building is just over 200,000 square feet of two story warehouse that is used for storage in the very back, and manufacturing production in the front part a warehouse. All sections of the warehouse must have Internet capability as well as Intranet connectivity.

The assignment is rather broad and speaking in general terms. Have fun with this though please address the key areas. You also submit a proposed budget for the wiring, equipment, installation and testing. The assignment should be 2-3 pages of content not counting title page, reference page or appendices (diagrams, budget sheet, equipment list, etc.). Please follow APA format and use credible supporting materials to make your case.

…………………Answer preview……………………………..
The primary purpose of this project proposal to clean up the wiring structure, develop a play to lay new fiber where appropriate using Cat 6 cable, and provide a presentation for a wireless LANs, and Wi-Fi capability at the Sunshine Health Corporation in Scottsdale, Arizona. The project will also provide the necessary budget……………………………
APA
680 words
Get instant access to the full solution from yourhomeworksolutions by clicking the purchase button below
× Lets chat on whatsapp?